OUR SERVICES AND technologies SUPPORT
 


Assure comprehensive quote and provide a one-stop-service:

Keller technology (KT) is a comprehensive system design company of planning for Architecture and equipment in an integrated optimal design, material selection for healthy, comfortable and low energy buildings with a tough quality and cost control including set into operation.

KT takes part in the project from the very beginning throughout the realization until the setting in operation. In this way, KT guarantees for the proper construction, selection of materials and right operation of the facilities in order to arrive at a healthy and comfortable building with low energy need.



The Service Philosophy of KT

Guarantee comprehensive product quality and provide end to end services
KT has the high capabilities in design, single construction design optimization, facility design, material selections, construction design optimization and facilities fine tune. KT has proven successful records in building healthy, comfortable, low energy consumption constructions and also controls the construction cost and quality during the whole process.

The key of KT Technology is the optimization of the building envelope as well as of the HVAC system. Although many people seem to be concerned about this issue, KT is the first and only one putting it into practice. In order to achieve an excellent result, it is essential to optimize the system as a whole as well as to use well established and tested sub-systems for the envelope, for the ventilation, for the heating and cooling. KT takes over the responsibility for the full system and must get the necessary authority from the real estate developer. It will thus not only do the planning, it will also select the hardware, supervise the construction preparation and the whole construction process and finally test the building before its delivery to the end users. It is open for a co-operation with the designing architect, the HVAC engineer and the suppliers of hardware.

 

The Services Offered in Detail

  • First step: Climate and environment analysis, emissions estimation (air quality, traffic noise etc.), end users special requests;

  • Second step: Realizing architecture plans and layers or supporting the architects as well as the HVAC engineers by an optimization of the envelope joints and the HVAC system using optimization techniques to select the best values of key design parameters. Design review for reliability, operability, maintainability, safety and lifetime cost;

  • Third step: Achieve total quality by supervising the design of the technical features for the envelope and the HVAC systems;

  • Fourth step: Construction process supervision on the site;

  • Fifth step: Testing the complete system and putting into operation.


 
     
Construction process supervision
on the MOMA site
  Realizing architecture plans and layers or supporting the architects
     

 
     
Testing the complete system   Realizing architecture plans and layers or supporting the architects

 
     
System Running regulation   Constraction site



 