|
First Application of KT's Technology in Hospital Construction
The 91st Central Hospital of People’s Liberation Army (PLA) Jiaozuo
No.91 central hospital of PLA located in Jiaozuo Henan Province is the first health and medicine project adopting KT’s healthy, comfortable and energy-saving building system in China. Keller Technologies supplied comprehensive services dedicated to the optimized design of building envelope, HVAC design, material selection and operation test for this project.
Name: PLA 91st Central Hospital and Mental Health Prevention Center
Type: Hospital Building and Mental Clinic
Location: Jiaozuo City, Henan Province, Industrial Road, No. 239
Size: 65’600 m2
Status: in operation since fall 2010
Investor: People's Liberation Army PLA
Design: Dr. Tian Yuan (Keller Technologies Ltd.)
Technology: Keller Technologies Ltd.
![]() |